Opel Vectra A

since 1988-1995 of release

Repair and car operation



Vektr A. Opel
+ 1. Maintenance instruction
+ 1.1 Maintenance
+ 2. Engine
+ 3. Repair of DOHC engines
+ 4. Repair of the diesel engine
+ 5. Cooling system
+ 6. Fuel system
+ 7. A fuel and exhaust system of models with system of injection of fuel
+ 8. Exhaust system and system of fall of toxicity of exhaust gases
+ 9. Fuel systems of the diesel engine
+ 10. Engine electrosystems
+ 11. Transmission
+ 12. Mechanical transmission
+ 13. Automatic transmission
+ 14. Power shafts
+ 15. Brake system
- 16. Suspension bracket
   16.2. General information
   16.3. Replacement of the bearing of a forward wheel
   16.4. Forward bottom frame
   16.5. Rack of a forward suspension bracket
   16.6. Bottom lever of a forward suspension bracket
   16.7. Replacement of plugs of the bottom lever of a forward suspension bracket
   16.8. Spherical hinge of the bottom lever of a forward suspension bracket
   16.9. Forward stabilizer of cross-section stability
   16.10. Replacement of plugs of the forward stabilizer cross-section устойчи vost
   16.11. Adjustment of the bearing of a back wheel (SOHC model)
   16.12. Replacement of the bearing of a back wheel (the SOHC model till 1993)
   16.13. Replacement of the bearing of a nave of a back wheel (model since 1993)
   16.14. A nave of a back wheel (model with the SOHC engine)
   16.15. Back shock-absorber
   16.16. Replacement of rubber elements of fastening of the back shock-absorber
   16.17. Springs of a back suspension bracket (SOHC model)
   16.18. Knot of longitudinal levers of a back suspension bracket (model with SOHC engines)
   16.19. Back stabilizer of cross-section stability
   16.20. Replacement of the plug of the longitudinal lever of a back suspension bracket
   16.21. A fixing element of a back nave (model with SOHC engines)
   16.22. Check of system of a being self-leveled back suspension bracket
   16.23. Control system elements being self-leveled a back suspension bracket
   16.24. Replacement of the bearing of a back wheel (model with DOHC engines)
   16.25. A nave of a back wheel (model with DOHC engines)
   16.26. Knot of a back suspension bracket (model with DOHC engines)
   16.27. The diagonal lever of a back suspension bracket (model with DOHC engines)
   16.28. Back stabilizer of cross-section stability
   16.29. Steering wheel
   16.30. Centering of a steering wheel
   16.31. Replacement of the elastic coupling of a shaft of steering transfer
   16.32. Steering column
   16.33. Repair of a steering column
   16.34. Shock-absorber of steering transfer
   + 16.35. Replacement of protective casings of steering transfer
   16.36. Air removal from steering system with the amplifier
   16.37. Pump of the amplifier of a steering
   16.38. Popolnitelny tank of system of the amplifier of a steering
   16.39. Pipes of cooling of liquid of the amplifier of a steering
   16.40. Tips of steering draft
   16.41. Steering draft
   16.42. Corners of installation of forward wheels
+ 17. Body
+ 18. Electric equipment
+ 19. Check of malfunctions



16.12. Replacement of the bearing of a back wheel (the SOHC model till 1993)

GENERAL INFORMATION

Prevention

At installation it is necessary to use a new sealing ring of a nave.


Removal of a sealing ring from the interior of a nave on models with back disk brakes

If at rotation the bearing publishes extraneous noise and has increased люфт, it is necessary to replace it. The nave of a back wheel is established on two conic roller bearings, and at wear of one bearing it is necessary to replace and the second bearing.

PERFORMANCE ORDER
1. Remove a nave of a back wheel.
2. If the internal ring of the external bearing remained in a nave, using a screw-driver, remove it
3. From the interior of a nave remove a sealing ring and take an internal ring of the internal bearing (see drawing).
4. Fix a nave in a vice with soft sponges and a copper drift beat out external rings of bearings from a nave. Thus a drift establish evenly around in order to avoid a bearing distortion.
Prevention

At knocking-out of bearings be careful, that did not remain забоины on a bearing seat in a nave.


5. Clear a nest for the bearing in a nave and, using an emery paper, remove all agnails.
6. Establish new external rings of bearings cones outside. Using a tubular opravka of the corresponding diameter, press rings of bearings in a nave. Thus be careful not to warp a ring as there can be their jamming and destruction.
7. Grease rings of bearings with lithium greasing and the same greasing fill space between bearings.
8. Establish an internal ring of the internal bearing on a place and grease a working edge of a new sealing ring and establish it into place with use of a tubular opravka to a sootvetstvo of yushchy diameter.
9. Establish a nave and adjust люфт the nave bearing.