Opel Vectra A

since 1988-1995 of release

Repair and car operation



Vektr A. Opel
+ 1. Maintenance instruction
+ 1.1 Maintenance
+ 2. Engine
+ 3. Repair of DOHC engines
+ 4. Repair of the diesel engine
+ 5. Cooling system
+ 6. Fuel system
+ 7. A fuel and exhaust system of models with system of injection of fuel
+ 8. Exhaust system and system of fall of toxicity of exhaust gases
+ 9. Fuel systems of the diesel engine
+ 10. Engine electrosystems
+ 11. Transmission
+ 12. Mechanical transmission
+ 13. Automatic transmission
+ 14. Power shafts
+ 15. Brake system
- 16. Suspension bracket
   16.2. General information
   16.3. Replacement of the bearing of a forward wheel
   16.4. Forward bottom frame
   16.5. Rack of a forward suspension bracket
   16.6. Bottom lever of a forward suspension bracket
   16.7. Replacement of plugs of the bottom lever of a forward suspension bracket
   16.8. Spherical hinge of the bottom lever of a forward suspension bracket
   16.9. Forward stabilizer of cross-section stability
   16.10. Replacement of plugs of the forward stabilizer cross-section устойчи vost
   16.11. Adjustment of the bearing of a back wheel (SOHC model)
   16.12. Replacement of the bearing of a back wheel (the SOHC model till 1993)
   16.13. Replacement of the bearing of a nave of a back wheel (model since 1993)
   16.14. A nave of a back wheel (model with the SOHC engine)
   16.15. Back shock-absorber
   16.16. Replacement of rubber elements of fastening of the back shock-absorber
   16.17. Springs of a back suspension bracket (SOHC model)
   16.18. Knot of longitudinal levers of a back suspension bracket (model with SOHC engines)
   16.19. Back stabilizer of cross-section stability
   16.20. Replacement of the plug of the longitudinal lever of a back suspension bracket
   16.21. A fixing element of a back nave (model with SOHC engines)
   16.22. Check of system of a being self-leveled back suspension bracket
   16.23. Control system elements being self-leveled a back suspension bracket
   16.24. Replacement of the bearing of a back wheel (model with DOHC engines)
   16.25. A nave of a back wheel (model with DOHC engines)
   16.26. Knot of a back suspension bracket (model with DOHC engines)
   16.27. The diagonal lever of a back suspension bracket (model with DOHC engines)
   16.28. Back stabilizer of cross-section stability
   16.29. Steering wheel
   16.30. Centering of a steering wheel
   16.31. Replacement of the elastic coupling of a shaft of steering transfer
   16.32. Steering column
   16.33. Repair of a steering column
   16.34. Shock-absorber of steering transfer
   + 16.35. Replacement of protective casings of steering transfer
   16.36. Air removal from steering system with the amplifier
   16.37. Pump of the amplifier of a steering
   16.38. Popolnitelny tank of system of the amplifier of a steering
   16.39. Pipes of cooling of liquid of the amplifier of a steering
   16.40. Tips of steering draft
   16.41. Steering draft
   16.42. Corners of installation of forward wheels
+ 17. Body
+ 18. Electric equipment
+ 19. Check of malfunctions



16.23. Control system elements being self-leveled a back suspension bracket

AIR VALVE

Removal

PERFORMANCE ORDER
1. For access to the air valve in a luggage compartment move back the floor panel.
2. Completely remove pressure in system.
3. Remove about the valve a cover and the plug, then compress clamps and вытолкните the valve down. Thus do not damage air lines.
4. Unscrew from the valve connecting couplings of air lines and remove the valve.

Installation

PERFORMANCE ORDER
1. Installation is made in sequence, return to removal.
2. Increase pressure in system to 0,8 bar and check tightness of connecting couplings.

AIR LINES

Removal

PERFORMANCE ORDER
1. Completely dump pressure in system.
2. Unscrew the connecting couplings, fixing an air line to the shock-absorber and the air valve, then take an air line from fastening brackets on the car bottom.

Installation

PERFORMANCE ORDER
1. Installation is made in sequence, return to removal.
2. Increase pressure in system to 0,8 bar and check tightness of connections.